Solar Net Metering in Delhi, Haryana & Gurgaon – Full Process (2025 Guide) | Shyvon power
- Shyvon power
- Dec 29, 2025
- 3 min read

Solar net metering plays a crucial role in maximizing savings from rooftop solar systems in Delhi NCR, Haryana, and Gurgaon. If you are planning to install solar panels for your home, apartment, or commercial building, understanding net metering is essential.
This blog explains what net metering is, how it works, eligibility, benefits, and the complete application process in 2025—in simple language.
What Is Solar Net Metering?
Net metering is a billing mechanism that allows solar system owners to export excess electricity generated by their solar panels to the grid and receive credits for it.
Solar power is used first for self-consumption
Extra units are sent to the grid
Exported units are adjusted against imported units
You pay only for the net electricity consumed
This significantly reduces monthly electricity bills.
📍 Is Net Metering Available in Delhi, Haryana & Gurgaon?
Yes. Net metering is available across:
Delhi (DISCOMs: BSES Yamuna, BSES Rajdhani, TPDDL)
Haryana (DHBVN & UHBVN)
Gurgaon / Gurugram (DHBVN)
Each state follows MNRE guidelines but has slightly different procedures and limits.
⚙️ How Does Solar Net Metering Work?
Solar panels generate electricity during the day
Your home or building consumes solar power first
Excess electricity flows to the grid via a bi-directional net meter
At night or low generation periods, power is drawn from the grid
Monthly bill shows:
Units imported
Units exported
Net units billed
🧾 Eligibility Criteria for Net Metering (2025)
✔ General Requirements
Rooftop solar system installed on owned or legally leased property
Grid-connected solar inverter
Approved net meter
Compliance with DISCOM technical standards
✔ System Size Limits (Indicative)
Residential: up to sanctioned load
Commercial & industrial: as per DISCOM policy
Apartments & societies: common meter net metering allowed in many cases
📝 Solar Net Metering Application Process (Step-by-Step)
🔹 Step 1: Solar System Installation
Install a grid-connected rooftop solar system as per DISCOM norms.
🔹 Step 2: Online Application
Apply for net metering on the DISCOM portal with:
System details
Single line diagram
Inverter & panel specifications
🔹 Step 3: Technical Feasibility Approval
DISCOM reviews the application and issues approval.
🔹 Step 4: Net Meter Installation
DISCOM installs or approves a bi-directional net meter.
🔹 Step 5: Inspection & Commissioning
Final inspection is conducted, and system is commissioned.
🔹 Step 6: Billing with Net Metering
Your electricity bill now reflects net energy usage.
Time Required for Net Metering Approval
Location | Approx. Timeline |
Delhi | 20–30 days |
Gurgaon | 25–40 days |
Haryana (Other cities) | 30–45 days |
Timelines depend on documentation accuracy and DISCOM workload.
Benefits of Solar Net Metering
✅ Reduces electricity bills by 70–90%
✅ Better ROI on solar investment
✅ No energy wastage
✅ Ideal for homes, offices & apartments
✅ Grid support during low generation
Net Metering for Apartments & Societies
Common area solar systems can use net metering
Lift, lighting, water pumps covered
Reduces monthly maintenance charges
Some states allow virtual/group net metering
Common Mistakes to Avoid
❌ Incorrect system design
❌ Non-approved inverter or panels
❌ Incomplete documents
❌ Not following DISCOM wiring norms
Professional planning helps avoid delays and rejections.
Final Thoughts
Solar net metering is the backbone of rooftop solar savings in Delhi NCR and Haryana. With correct system design and proper approvals, it ensures faster payback and long-term financial benefits.
If you’re planning to go solar, understanding net metering upfront will help you make smarter decisions and avoid delays.
Solar net metering
Net metering Delhi
Solar net meter Gurgaon
Solar net metering process in Delhi 2025
Net metering rules in Haryana
How net metering works for rooftop solar
Solar net meter installation Gurgaon
Rooftop solar net metering India